PG&E Gas Distribution System Capacity and Reliability Project
PG&E will replace gas line mains and distribution lines through courts in Schoonover Park I.
Attachment A_CEQA Supporting Documentation
PG&E Electrical Conduit Improvements - Trenton Court
PG&E will be installing replacement electrical conduit underground behind residences on Trenton Court.
PG&E's Replace Insulators
PG&E's Project to Replace Insulators along the Moss Landing-Del Monte #1 and #2 kV Electric Transmission Lines in East Campus Open Space.
CSU Monterey Bay Fuel Management Plan for East Campus Housing Area
Attachment A. DRAFT CSUMB East Campus Housing Area Fuel Management Plan
- Attachment A. Calfire Defensible Space Flyer
- Attachment B. Calfire Vertical Plant and Tree Spacing
- Attachment C. Calfire Horizontal Plant and Tree Spacing
- Attachment D. CSUMB Fuel Reduction and Defensible Space Activities
- Attachment E Best Management Practices Fuel Reduction and Defensible Space Activity Timetable
Attachment B_CEQA Supplemental Documentation
- Biological Resources Report for the Fuel Management Plan for the East Campus Housing Area APPENDICES
CSU Monterey Bay Master Plan Final Environmental Impact Report (FEIR)
Complete Final EIR Documents
CSU Monterey Bay Draft Master Plan Environmental Impact Report (DEIR)
For a brief overview of the Master Plan DEIR and instructions on how to provide a comment, please review the presentation and Notice of Availability links below. Comments can be emailed to aspear@csumb.edu or mailed to the campus at the address provided in the Notice of Availability.
CSUMB Master Plan Draft EIR Presentation
Complete Draft EIR Document
Individual Draft EIR Sections
- Title Page and Table of Contents
- Acronyms List
- Executive Summary
- Introduction
- Project Description
- Intro to Analysis
- Aesthetics
- Air Quality
- Biological Resources
- Cultural and Tribal Cultural Resources
- Geology, Soils and Paleontology
- GHG Emissions
- Hazards
- Hydrology and Water Quality
- Land Use and Planning
- Noise and Vibration
- Population and Housing
- Public Services and Recreation
- Transportation
- Utilities and Energy
- Other CEQA Considerations
- Alternatives
- List of Preparers
Individual Appendices
- Appendix A - NOP
- Appendix B - NOP Comments
- Appendix C - Student Housing and Parking Management Guidelines
- Appendix D - Air Quality Greenhouse Gas Emissions and Energy Calculations
- Appendix E - Biological Resources Report 02.01.22 Compiled with Figures
- Appendix F - Cultural Resources and Built Environment Reports
- Appendix G - Noise Measurements and Calculations
- Appendix H - Transportation Analysis
Freeman Stadium Facilities Renovation Project
Public Drafts-Initial Study/Mitigated Negative Declaration
- Final NOI - Freeman Stadium Facilities Renovations Project
- Initial Study/Mitigated Negative Declaration
- Appendix A. Photometric Analysis
- Appendix B. CalEEMod Results
- Appendix C. Freeman Stadium: State of California, Department of Parks and Recreation Form 523 (Buildings, Structure, and Object Record)
- Appendix D. VMT Analysis
Final Documents-Initial Study/Mitigated Negative Declaration
- NOD_CSUMB Freeman Stadium Facilities Renovation Project
- Final IS-MND_CSUMB Freeman Stadium Facilities Renovation Project
- Appendix A - Lighting Study
- Appendix B - CalEEMod Results
- Appendix C - DPR_523_Freeman Stadium
- Appendix D - VMT Impact Analysis
- Appendix E - MMRP
- Appendix F - Responses to Comments
CSU Monterey Bay Master Plan Final Environmental Impact Report (FEIR)
Notice of Availability
Complete Final EIR Documents
-
CSUMB Master Plan FEIR (Volume I)
-
CSUMB Master Plan FEIR Appendices (Volume II)